Register For UPSC IAS New Batch

MIZORAM GETS FIRST RAIL LINK

For Latest Updates, Current Affairs & Knowledgeable Content.

MIZORAM GETS FIRST RAIL LINK

WHY IN NEWS?

  • On 14th September 2025, Prime Minister Narendra Modi inaugurated Mizoram’s first railway line — the Bairabi–Sairang broad-gauge project, linking the state capital Aizawl to the national railway network for the first time.
  • Built at a cost of ₹8,070 crore, the project is considered one of the most challenging railway constructions in India.
  • PM also flagged off three new long-distance trains including the Sairang–Delhi Rajdhani Express.

PROJECT OVERVIEW

Particulars Details
Project Name Bairabi–Sairang Broad-Gauge Railway Line
Length 51.38 km
Total Cost ₹8,070 crore
Inauguration Date 14 September 2025
Launched by PM Narendra Modi
Executing Agency Indian Railways (Northeast Frontier Railway)
Sanctioned in 2008–09
Construction Started 2015
Stations Added Hortoki, Kawnpui, Mualkhang, Sairang
Capital Linked Aizawl (4th NE capital to get rail link)

ENGINEERING MARVEL: CHALLENGES & FEATURES

Complex Engineering

  • 45 Tunnels, 55 Major Bridges, 87 Minor Bridges
  • 10 Road Over/Underpasses
  • 54% of the route passes through tunnels and bridges

Notable Structure

  • Bridge No. 144 near Sairang
    • Height: 114 metres
    • Taller than Qutub Minar
    • Tallest pier railway bridge in India

Terrain Challenges

  • Difficult Himalayan geology, landslides, and loose soils
  • Special technique used: solidifying sand into rock for tunnel excavation

RAILWAY CONNECTIVITY BOOST

First Rail Link to Mizoram’s Capital

  • Connects Bairabi (on Assam–Mizoram border) to Sairang, 20 km from Aizawl
  • Aizawl becomes 4th NE capital with railway access after:
    • Guwahati (Assam)
    • Agartala (Tripura)
    • Itanagar (Arunachal Pradesh)

NEW TRAINS FLAGGED OFF

Train Frequency Route
Sairang–Delhi Rajdhani Express Weekly Sairang → Anand Vihar Terminal (via Guwahati)
Sairang–Guwahati Express Daily Sairang ↔ Guwahati
Sairang–Kolkata Express Thrice Weekly Sairang ↔ Kolkata

MAJOR PROJECTS

Project Scheme
Aizawl Bypass (45 km) PM-DevINE
Thenzawl–Sialsuk Road NESIDS
Khankawn–Rongura Road NESIDS
Chhimtuipui Bridge Kaladan Multimodal Project
LPG Bottling Plant at Mualkhang Oil & Gas Infrastructure
Sports Infrastructure PM Development Initiatives
Residential Schools PMJVK & Eklavya Model

 IMPACT & SIGNIFICANCE

Strategic & National Integration

  • Part of Act East Policy
  • Enhances connectivity with Myanmar, Southeast Asia (via Kaladan Multimodal Transit)
  • Boosts border management and defense logistics

Economic & Social Impact

  • Improved Market Access for:
    • Ginger processors
    • Dragon fruit farmers
    • Horticulture & Paddy cultivators
  • Boost to tourism, trade, and cross-border commerce

Employment & Livelihood

  • Direct and indirect job creation
  • Enhanced logistics reduces cost of essential commodities

STRATEGIC LOCATION & GEOPOLITICAL SIGNIFICANCE

Aspect Importance
Proximity to Myanmar Border Supports Act East trade
Kaladan Corridor Linkage India–Myanmar–Mizoram route becomes more viable
All-weather Access Chhimtuipui bridge and new roads support year-round movement
Logistics Hub Potential Aizawl and Sairang could emerge as key NE transit points

CONCLUSION

The Bairabi–Sairang railway line is more than a transport corridor—it symbolizes India’s commitment to inclusive development, border area empowerment, and strategic connectivity. As India accelerates its Act East Policy, this historic milestone in Mizoram’s history is expected to catalyze economic transformation, national integration, and regional peace in the North-East.

 

Note: Connect with Vajirao & Reddy Institute to keep yourself updated with latest UPSC Current Affairs in English.

Note: We upload Current Affairs Except Sunday.

Call Now Button